CASHMAN INDUSTRIAL RETROFIT

This 2.5 year Industrial and Office Space retrofit included a very diverse array of Design/Build and Plan/Spec applications. All of the office and factory areas on this campus received new HVAC equipment and air distribution systems. This project required close coordination with the General Contractor and owner's representatives since it involved building a factory within a factory while it was in operation! in addition to successfully completing this project ahead of schedule Maxwell Mechanical saved the Cashman company over $500,000 in value engineering throughout the project.

SPARKS, NV
CASHMAN EQUIPMENT
INDUSTRIAL RETROFIT

Sales Offices Remodel

  • 12,250sf HVAC retrofit, Air compressor
    ventilation system, training room ventilation

Fluids Testing Lab

  • Design and installation of 30 ton outside air variable cooling and heating system with DDC controls

Truck Shop Warehouse HVAC Retrofit (76,000sf)

  • Addition of 200,000cfm of heating and evaporative cooling, air compressor ventilation, clean room system, 12,500 sf office retrofit, pump room ventilation system, campus wide DDC control system

Outdoor Haul Truck Wash

  • Design Build radiant anti-freeze system

Dyno Room Cooling Towers

  • Design and installation of Hydronic/evaporative cooling system including two cooling towers,
    x10 60 psi pumps, welded pipe, fuel supply system

Robotic Parts Washer

  • Design and installation of exhaust and moisture
    baffle system